Fullsun Mini Toolbox
Breadcrumbs

Installation

Installation may vary depending on urinal.


Step 1
Provide water supply and drainage and optionally power supply according to the diagram.

image-20241106-140939.png

Step 2
Drill the fixing holes for the urinal mounting brackets. Refer to the urinal’s datasheet for all dimensions.

image-20241106-141019.png

Step 3
Install the wall plugs.

image-20241106-141035.png

Step 4
Attach the urinal’s mounting brackets.

image-20241106-141049.png

Step 5
Install the angle valve and make sure the outlet point downwards.

image-20241106-141103.png

Step 6
Rinse the pipes for at least 45s.

image-20241106-141115.png

Step 7
Connect the flexible hose
to the angle valve.

image-20241106-141141.png

Step 8
Connect the CRP2 battery to the IPEE Mini sensor.

Only for 6V battery version

image-20241106-141204.png

Step 9
Connect the power supply
to the mains via the junction box.

Only for 230V mains version

image-20241106-141217.png

Step 10
Open the angle valve.

image-20241106-141229.png

Step 11
Mount the urinal to the wall using the provided fixation kit.

image-20241106-141239.png

Step 12
Turn on the fuse.

Only for 230V mains version

image-20241106-141252.png

Step 13
Your urinal Pack with IPEE Mini
is ready for use.

image-20241106-141305.png

Mini installation manual

Installation manual